When Should I Start Planning My Spring Linen Collection?

Update Time:2026/9/20

Direct Answer

When Should I Start Planning My Spring Linen Collection?

Start five to seven months before your target retail floor date. For a February to May spring season that means beginning range and fabric planning in September, issuing tech packs in early October, approving samples through November and confirming the bulk order by early December, which leaves production and ocean freight enough room to land before the selling window opens. The arithmetic behind that date is fixed: sampling takes 7-12 days per round, bulk production runs 25-35 days, ocean freight takes about 30-45 days, and a first order typically ships 35-60 days from confirmation. If you are working with a stocked fabric quality and one sample round, five months is achievable; if you are commissioning a new weave, colourway or a structured piece, allow seven. Our full seasonal linen buying calendar maps every month of that window in detail.


The Three Planning Windows You Have to Protect

Spring planning is not one long block of work. It is three windows stacked on top of each other, and each one produces the inputs the next one depends on. Compressing a later window is expensive; compressing an earlier window is nearly impossible, because trend and range decisions set the fabric order.

1. Range and fabric

Six to seven months out. Silhouettes, fabric weights, colour direction and target cost are decided, and swatches are requested. This is the last cheap moment to change direction, because nothing has been booked yet.

2. Development and sampling

Four to six months out. Tech packs are issued, fabric is booked, and counter samples run 7-12 days per round. Fit, shrinkage and colour are approved here, on a washed sample rather than a pressed one.

3. Order and production

Two to four months out. Bulk is confirmed, cut and sewn in 25-35 days, inspected, packed and shipped by ocean at roughly 30-45 days transit. No new decisions belong in this window.

Brands that treat these as one window usually find that range decisions drift into the sampling window and colour approval drifts into production. Each drift removes buffer from the end of the chain, which is the part that cannot absorb it.

Step by Step: Building the Reverse Spring Calendar

Work backwards from the date product must be available to sell. Each step below produces a document or an approval that the next step consumes, which is why they cannot be run in parallel.

1
Fix the retail-on-floor date. Choose the week the collection must be live in your first channel. Every other date is derived from this one, so it should be a decision rather than an estimate.
2
Subtract delivery and clearance. Allow 3-10 days for inland distribution and 3-7 days for customs and port handling behind the ocean leg. This gives you the date goods must leave the factory.
3
Subtract ocean freight. At roughly 30-45 days port to port, the shipment has to be booked and released well before the departure you want. If your date is already tight, this is the step where air freight becomes a discussion rather than a plan.
4
Subtract bulk production and inspection. Allow 25-35 days for production plus 2-5 days for final inspection and packing. Add buffer here rather than at the sample stage, because this is where queue position and holidays bite.
5
Subtract sampling. Budget 7-12 days per round with a 7-14 day planning window that includes courier time, and assume at least one revision on a new style. The sequence inside that window is explained in how long sampling takes at a linen clothing manufacturer.
6
Subtract fabric booking. Stocked linen qualities need two to four weeks; a custom weave, dye lot or special finish needs longer. The date that lands here is your true order deadline, and it is normally four to six weeks earlier than buyers expect.

Run the six steps once with working durations and once with planning durations, and use the earlier of the two results as your deadline. The gap between them is the buffer you are deliberately holding, and it is what keeps the collection inside its season.

Spring Planning Timeline at a Glance

The table below applies the reverse calendar to a February to May spring floor date. It assumes a first order with a factory, one to two sample rounds and ocean freight, which is the normal configuration for a new linen collection.

Runway before floor dateCalendar monthMilestoneSign-off required
7-6 monthsAugust to SeptemberRange planning and fabric researchSilhouettes, weights, colour direction, target price
6-5 monthsSeptember to OctoberTech packs issued, fabric bookedSpecification, GSM, finish, trims, label artwork
5-4 monthsOctober to NovemberCounter samples and fit roundsFit at smallest and largest size, shrinkage after wash
4-3 monthsNovember to early DecemberBulk order confirmed, production slot assignedFinal measurements, colour, packaging, deposit
3-2 monthsDecember to JanuaryBulk production and final inspectionInspection standard and carton marks only
2-1 monthsJanuary to FebruaryOcean transit, clearance, deliveryIncoterms, duties, warehouse plan

Durations reflect Linenwind's published parameters: sampling 7-12 days within a 7-14 day window, bulk production 25-35 days, first order 35-60 days from confirmation, and ocean transit of roughly 30-45 days. Adjust the front of the table if your fabric is not a stocked quality.

Read the table from the bottom up when you are checking your own plan. If the shipment has to clear customs in mid-January and your fabric is not booked until November, the calendar already contains a gap that will be filled by air freight. The stage durations themselves are covered in the average lead time for linen clothing manufacturing, and the table above simply places them on dates.

Buffer, Shutdowns and Freight: What Actually Breaks the Plan

Three forces routinely consume the buffer you built into the calendar, and all three are predictable. Planning for them is what separates a programme that lands on time from one that pays for air freight.

Hold three to four weeks of total float on a stocked fabric first order and six weeks or more for a new weave, a new colourway or a structured style. Place most of that float before freight booking, where a delay costs the most to recover.

  • The Spring Festival shutdown. Chinese factories close for two to three weeks around the lunar new year, which falls in late January or early February, with a further week of reduced output as workers return. Any bulk order that cannot finish before the closure must be planned as though it starts a week after reopening.
  • Golden Week in early October. Mills, dyehouses and factories pause for about a week, which matters because October is also the month spring fabric is usually booked.
  • Freight mode. Ocean at 30-45 days is the default for bulk linen, rail to inland Europe runs 18-28 days, and air takes 3-8 days at several times the cost. If a launch date is genuinely immovable, the usual answer is to split the shipment rather than pay air rates on the whole order.
Retail-on-floor date fixed before any other date is set
Shutdown dates requested in writing with the order confirmation
Buffer placed before freight booking, not at the sample stage
Fabric quality confirmed as stocked or made to order
Sample rounds budgeted against the published sampling window
Shipping mode and Incoterms chosen before the order is placed

Quality inspection then runs against the specification you approved in the sampling window, which is why the specification has to be final before bulk. We inspect at AQL 2.5 against the agreed measurements and tolerances, and that check is only meaningful when nothing in the spec is still moving.

What to Prepare Before You Start Planning

Planning starts faster when four things already exist. Each one shortens the front of the calendar and removes a round of questions before sampling begins.

Lead market and price band. Fit and cost are approved once, in the market that carries the most revenue, and everything else follows from that decision.
A workable tech pack. Construction, measurement tables, grading, trims, colour and label artwork, attached as appendices rather than written into an email thread.
Fabric direction and weight range. Woven linen for spring usually sits between about 100 and 200 GSM, with the heavier end used for trousers and structured pieces.
Quantities per style and colour. Orders start at 60 pieces per style per colour, counted across the size run, so a first order can be split across five sizes at 12 pieces each.

If the tech pack is the part you are least confident about, publish it as a working draft rather than waiting for it to be perfect. The document is a communication tool, and a factory can cost and schedule from a complete draft far more accurately than from a verbal brief. The structure we expect to receive is set out in our tech pack guide, and it can be refined during the sampling round rather than before it. Brands placing their first linen order at all will find the overall sequence in how to start a custom linen order.

Do not treat a January start as a late but acceptable spring plan. By January the fabric choice has narrowed to stocked qualities, sampling has to be compressed into one round, and ocean freight no longer fits before a February or March floor date. The order still happens, but it happens by air and at a cost that usually comes straight out of the product margin.

Send us your target spring floor date, styles, quantities, fabric direction and destination markets, and we will build a reverse calendar against it and confirm which fabric qualities fit the window. Orders start at 60 pieces per style per colour, sampling takes 7-12 days, bulk production runs 25-35 days, and sample charges of 40-150 US dollars are refundable against bulk.

Plan Your Spring OrderRead the Seasonal Buying Calendar

Figures in this answer are Linenwind's published manufacturing parameters for custom linen apparel: MOQ 60 pieces per style per colour, sampling 7-12 days within a 7-14 day window, bulk production 25-35 days, first order 35-60 days from confirmation, ocean transit of roughly 30-45 days, first-wash shrinkage 3-7 percent, fabric weights from about 100 to 260 GSM, more than 50 fabric specifications held in stock, AQL 2.5 inspection, sample charges of roughly 40-150 US dollars refundable against bulk, and certification coverage including ISO 9001, OEKO-TEX Standard 100 and SEDEX membership. Holiday dates and transit times vary by route and should be confirmed with your freight forwarder for each shipment.