How long is bulk production at linen clothing manufacturers?

Update Time:2026/1/1

How Long Is Bulk Production at Linen Clothing Manufacturers?

Short Answer Bulk production at linen clothing manufacturers typically takes 25–45 days after sample approval, and 30–60 days for custom developments or new patterns. Linenwind delivers most core orders in 25–35 days with low MOQ (60 pcs).

Typical Linen Bulk Production Timelines

StageTimeframeWhat Happens
Pre-Production5–10 daysTech pack confirmation, BOM, fabric booking
Bulk Fabric Preparation7–14 daysWeaving/dyeing, shrinkage control, finishing
Cutting & Sewing10–20 daysManufacturing + inline QA checkpoints
Washing & Finishing3–7 daysLinen shrinkage control, pressing, softening
Final QC & Packing3–5 daysAQL inspection, packing, carton prep
Total Lead Time25–45 daysStandard small-batch production

What Can Affect Lead Time?

Faster (≈25 days)Slower (≈45–60 days)
Existing patternsNew silhouettes / pattern engineering
Local stock fabricsImported / exclusive fabric sourcing
Core shirts / shorts / pantsBias cuts, pleats, lining, garment-dye
MOQ 60–120 pcsComplex trims, embroidery, packaging

Why Linen Production Takes Time

ReasonImpact on Lead Time
Shrinkage sensitivityRequires controlled pre-wash cycles
Natural slub textureIncreased defect inspection stages
Dyeing absorbencyColorfastness testing needed
Thread/needle matchingSlower setup vs synthetics/cotton

Linen behaves differently → timelines must respect material science.

Linenwind Bulk Production Timeline

Order TypeLead Time
Standard Styles25–35 days
Custom OEM/ODM30–45 days
First-Time Development45–60 days

We support brands with:

  • European flax linen sourcing (France/Belgium)
  • OEM & ODM: CAD, sampling, trims, packaging
  • Low MOQ 60 pcs
  • Real-time production updates

OEM & ODM Linen ManufacturerCustom Linen Product CollectionsGet Production Timelines & Quotes

Production Timeline Example — Linen Shirts (MOQ 60 pcs)

DayMilestone
1–3PPS sample approval + final confirmation
4–10Fabric prep + dyeing (if needed)
11–20Cutting → sewing → inline QC
21–25Wash test, shrinkage control, finishing
26–30Final QC, packing, carton sealing
31+Shipping (air 5–12 days / sea 20–40 days)

FAQ — Linen Production Lead Time

Q: Does production time include sampling?
A: No — sampling is a separate stage. Bulk timeline starts after final PPS approval.
Q: Can I shorten the lead time?
A: Yes, when using stock fabric, simple cuts, or existing patterns.
Q: What slows production the most?
A: New designs, imported fabric, garment dye, embroidery, and peak season.
Q: Can I schedule multiple batches?
A: Yes — Linenwind supports repeat orders and rolling delivery.
Request Your Timeline →